Skip to content
VietVance
Logistics

Sections of Đồng Nai Riverside Boulevard Open, With 12 Lanes Planned

Đồng Nai’s Nguyễn Hữu Cảnh Boulevard is about 15.5 km long and planned for 12 lanes, with total investment exceeding VND 4.6 trillion. The section from National Highway 51 to Vàm Cái Sứt Bridge is open, while the final section leading to the Ho Chi Minh City–Long Thành–Dầu Giây Expressway remains under construction.

VietVance

1 min read

Nguyễn Hữu Cảnh Boulevard in Đồng Nai connects National Highway 51 with the Ho Chi Minh City–Long Thành–Dầu Giây Expressway. It is about 15.5 km long, 60 m wide and planned for 12 lanes. The section from National Highway 51 to Vàm Cái Sứt Bridge is open, while construction crews are still adjusting the center of the road to meet the planned cross-section specifications.

Nguyễn Hữu Cảnh Boulevard connects National Highway 51 with the Ho Chi Minh City–Long Thành–Dầu Giây Expressway and is about 15.5 km long.(VietVance)

The project has total investment of more than VND 4.6 trillion, with Công ty Cổ phần Đầu tư hạ tầng Donacoop as the investor. Running along the Đồng Nai River, the route is intended to form a transport corridor and riverside landscape axis. Under relevant development plans, the boulevard is expected to improve regional transport links and create conditions for riverside land and urban development.

The boulevard is planned for 12 lanes, and the section from National Highway 51 to Vàm Cái Sứt Bridge is open.(VietVance)

The project has three sections: nearly 2 km from National Highway 51 to An Hòa 2 Bridge, with six lanes on the main roadway plus service roads, drainage, landscaping and lighting; about 6.2 km from An Hòa 2 Bridge to Vàm Cái Sứt Bridge; and about 7.5 km from Vàm Cái Sứt Bridge to the expressway. The final section is under construction, so the full route is not yet connected.

An Hòa 2 Bridge is in use, while the road surface and related facilities between the bridge and Vàm Cái Sứt Bridge are still being completed in stages. The boulevard passes through the Aqua City urban area along the Đồng Nai River. Once completed, the project is expected to improve links between riverside urban areas and the regional road network.

The final section, about 7.5 km from Vàm Cái Sứt Bridge to the expressway, is under construction.(VietVance)

Source: VietVance

Related