Construction Begins on Four Berths at Hải Phòng’s Lạch Huyện Port
Construction began on container berths 9–12 at Hải Phòng’s Lạch Huyện Port on November 23, 2026. The project has an investment of VND 24.845 trillion and a designed annual capacity of 4.7 million TEU. It will connect with an inland port in Bắc Ninh and a nearby industrial park.
On November 23, 2026, Vietnamese Prime Minister Lê Minh Hưng attended the groundbreaking ceremony for container berths 9–12 at Hải Phòng’s Lạch Huyện Port. The project, commercially known as HXPICT, is being developed by Lạch Huyện Port Investment JSC. It has a total investment of VND 24.845 trillion and a designed annual capacity of 4.7 million TEU.

Vietnamese Prime Minister Lê Minh Hưng and other attendees at the groundbreaking ceremony for the Hải Phòng port project and a high-purity materials manufacturing plant.(VietVance)
The project comprises four deep-water container berths covering about 146.2 hectares of land and water. The berths will have a combined quay length of 1,800 meters, with each berth measuring 450 meters, and will be able to handle container ships carrying up to 24,000 TEU. A separate 400-meter barge berth will serve inland waterway cargo. The project will also include container yards, repair workshops, roads and supporting facilities.
The project’s investors said the berths, once operational, will increase port capacity for northern Vietnam’s imports and exports, strengthen connections with major shipping routes to Europe and the Americas, and help reduce logistics costs. The project will connect with an inland port in Bắc Ninh and the 752-hectare Xuân Cầu Industrial Park and Non-Tariff Zone. The investor is a joint venture between PSA Việt Nam and Lạch Huyện International Deep-Water Port Industrial Park and Logistics JSC.
On the same day, construction also began on a high-purity materials plant for high-tech industry in the Xuân Cầu Industrial Park and Non-Tariff Zone. Developed by Khánh An Industry JSC, the plant will use clean rare-earth feedstock. The project has a total investment of VND 1.58 trillion and covers 14 hectares.
Source: VietVance


