Hanoi Proposes Phased Construction of 25.3 km Provincial Road 429D
Hanoi’s Department of Construction proposes building sections of Provincial Road 429D initially with a roadbed width of 21 to 21.5 meters, instead of the planned 42 meters. The Phúc Sơn Bridge would be built to its planned six-lane width. Of the roughly 25.3 km route, only 5.3 km is currently under construction.

