Skip to content
VietVance

Site search

Logistics

Hanoi–Hai Phong Expressway’s Construction and Smart Tolling

The 105-kilometer Hanoi–Hai Phong Expressway fully opened in December 2015. Vietnam’s Government News says it was the country’s first expressway built to international standards. It uses electronic toll collection throughout and has traffic monitoring and vehicle weighing systems.

VietVance

1 min read

According to Vietnam’s Government News, the Hanoi–Hai Phong Expressway is the country’s first expressway built to international standards. The 105-kilometer road has six traffic lanes and two emergency stopping lanes. Construction began in September 2008, and the entire route opened in December 2015. The project was developed by Vietnam Infrastructure Development and Finance Investment Corporation (VIDIFI) under a build-operate-transfer (BOT) arrangement.

Illustrative photo of an expressway.(VietVance)

A VIDIFI representative said the expressway has played a pioneering role in transport policy and technology. Electronic toll collection operates across the entire route, helping reduce congestion at toll plazas and save travel time. An intelligent monitoring system also enables penalties to be issued for speeding, illegal parking and driving in the wrong lane without stopping vehicles.

Since it opened, the expressway has had around-the-clock vehicle weighing systems at entrances from every direction. Vehicles can be checked without stopping. Those exceeding the permitted weight are directed onto a dedicated road to leave the expressway, helping protect road safety and infrastructure.

Vietnam began piloting electronic toll collection in 2015 and extended it to its entire expressway network in August 2022. According to the Ministry of Construction, VETC’s automated road toll service uses radio-frequency identification to identify vehicles and electronic payments to record transactions, achieving 99.98% toll collection accuracy. In the second quarter of 2022, VETC Electronic Toll Collection Co., Ltd. deployed the systems on four expressways in 50 days, covering 28 toll plazas and 132 lanes.

Source: VietVance

Related