Skip to content
VietVance

Site search

Policy & Regulation

Hanoi Proposes Rules for More Than 126,000 Commercial Motorbikes

Hanoi’s Department of Construction has proposed rules for motorbikes and non-motorized vehicles used to transport passengers and goods. App operators report 126,526 commercial motorbikes in the city. The draft would set requirements for drivers, vehicles, operating areas, passenger pickup and loading locations, and is expected to be submitted for approval in November 2026.

VietVance

1 min read

Hanoi’s Department of Construction has proposed dedicated regulations for motorbikes and non-motorized vehicles used to transport passengers and goods commercially. According to reports from transport app operators, 126,526 motorbikes are used commercially in Hanoi: 47,881 with Be Group, 65,593 with Grab and 13,052 with GSM. The figures do not include independent operators who have not been fully counted.

App-based motorbike rides and motorbike deliveries are increasingly common on Hanoi’s streets.(VietVance)

Documents submitted by Hanoi’s Department of Construction show that the city has about 6.9 million motorcycles and motorbikes, along with more than 11,000 electric bicycles and electric motorbikes. The department says the growth in commercial vehicles has created challenges involving traffic violations, vehicle safety, and insurance for passengers and goods. Unregulated stops in roadways and on sidewalks to pick up passengers or load and unload goods also put pressure on urban traffic order.

The proposed decision has three chapters and 13 articles covering drivers, commercial vehicles, passengers and goods carried on vehicles, operating areas, and places to wait for passengers and load or unload goods. The draft would also clarify the responsibilities of transport app operators and assign relevant departments and local authorities duties for management, inspections and handling violations. Operators would have to meet their legal obligations, including financial obligations.

The draft has undergone consultation, review and revision since late 2024. In 2026, Hanoi’s Department of Construction continued to seek input from relevant departments, 126 wards and communes, and related organizations and individuals. On September 14, Hanoi’s Department of Justice completed its review and found that the draft could be submitted for consideration after revisions addressing its comments. The Department of Construction provided a further explanation on October 30 and asked the city government to consider approving it; the submission indicated that the decision was expected to be put forward for issuance in November 2026.

Source: VietVance

Related