Vietnam Airport Terminal’s 5,300-Ton Steel Roof Lifted into Place
On April 4, 2025, the central steel roof of a terminal at an international airport under construction in Vietnam was lifted into position. Weighing about 5,300 tons and covering nearly 20,000 square meters, it was raised using 56 hydraulic jacks, with 3D scanning and load monitoring helping control installation accuracy.

