How Vietnam’s Tallest Building Was Built on 28 Meters of Soft Soil
The 461-meter Landmark 81 stands on a former port site beside the Saigon River, above about 28 meters of extremely soft clay. Its foundation uses 143 rectangular piles reaching depths of up to 90 meters, and its raft foundation was poured continuously for 41 hours. Contractor Coteccons reported 51% year-on-year revenue growth in the first quarter of fiscal 2027.
The 461-meter Landmark 81 stands beside the Saigon River. Project information from Arup shows that the building has 81 above-ground floors, three basement levels and a total floor area of 241,000 square meters. It was topped out in January 2018. The site was once a port, and an approximately 28-meter-thick layer of extremely soft clay beneath it posed a challenge for the high-rise foundation.
The project uses a foundation combining a raft with rectangular reinforced-concrete cast-in-place piles. French group VINCI said its subsidiary installed 143 piles for the project, reaching depths of up to 90 meters, and completed the piling work on September 11, 2015. According to the Vietnam Geotechnical Society, the raft foundation covers about 3,000 square meters, is 8.4 meters thick and contains more than 17,000 cubic meters of concrete and about 6,500 metric tons of steel.

Landmark 81 stands beside the Saigon River, above an approximately 28-meter-thick layer of soft soil.(VietVance)
Concrete was poured for the raft foundation continuously for 41 hours, involving about 700 people and approximately 1,700 concrete mixer truck trips. Project manager Mace said it was Vietnam’s largest continuous concrete pour at the time. The construction team also used a chilled-water system to control the heat generated as the large volume of concrete hardened.

Landmark 81’s raft foundation contains more than 17,000 cubic meters of concrete.(VietVance)
Vietnamese construction company Coteccons (Công ty CP Xây dựng Coteccons) was the main contractor for the building’s superstructure. The steel structure at the top of the tower was divided into 10 sections, each weighing an average of 16.5 metric tons; the final section was hoisted into place on April 9, 2018. The structure brought the building’s total height to approximately 461 meters. It remains Vietnam’s tallest building.
Coteccons’ consolidated financial statements show net revenue of 11.269 trillion Vietnamese dong in the first quarter of fiscal 2027 (July to September 2026), up 51% year on year, and after-tax profit of 305 billion dong, up 3.6%. Operating cash flow for the quarter was negative 775 billion dong, while customer receivables exceeded 16 trillion dong. The company plans to generate 42 trillion dong in revenue in fiscal 2027.
Source: VietVance